Steam Boiler Tube and Tube Sheet Renewal

Removal of boiler tubes, cutting out damaged tube sheet sections, fabrication and fitting of a new sheet, and expansion of the tube ends.

The boiler is opened and the work area prepared. Existing tubes are removed and the damaged section of the sheet is cut out. A new sheet is dimensioned and fabricated with the hole pattern matched to the existing equipment. The sheet is positioned and welded into the shell, new tubes are fitted and their ends expanded. Much of this work is carried out on board in confined spaces.

Tube sheetBoiler tubeExpansionOn boardConfined space
Renewed tube bank inside the boiler
Renewed tube bank inside the boiler
01

Scope

Sequence of work

  1. Opening the boiler and preparing the work area
  2. Removal of existing tubes
  3. Cutting out damaged tube sheet sections
  4. Dimensioning and fabrication of the new sheet
  5. Hole pattern matched to the existing equipment
  6. Positioning and welding the sheet into the shell
  7. Installation of new tubes
  8. Expansion of the tube ends
  9. Dimensional and tightness checks

Where the work is done

  • On board, in the machinery space or on deck
  • In the yard, while the vessel is docked or alongside
  • In the workshop in Tuzla, when the equipment is removed and brought in
  • Across Türkiye and, where required, in foreign ports
02

From this work

The photographs were taken in the field and in the workshop. The captions describe only what is visible.

Renewed tube bank inside the boiler
Renewed tube bank inside the boiler
Work on the tube sheet, seen from inside the boiler
Work on the tube sheet, seen from inside the boiler
New sheet section in place with the tube holes open
New sheet section in place with the tube holes open
The original tube sheet after removal
The original tube sheet after removal
Fabricated sheet sections before transport to the vessel
Fabricated sheet sections before transport to the vessel
Rolled plate section before fitting
Rolled plate section before fitting
Working in the confined space inside the boiler
Working in the confined space inside the boiler
03

Other services

04

Contact

Request a survey

Scope and duration are not quoted before the failure has been seen in place. Let us know the port where the vessel lies and the type of equipment, and contact us using the details below to arrange a survey.