Inspection of a MIURA marine composite boiler identified deformation and wear in a section of the water-tube bank requiring renewal.
The affected tubes were removed and the tube-sheet area prepared for refitting. New tubes were prepared to the required dimensions, positioned inside the boiler and installed. The work was completed as a precise intervention in a confined boiler space, with careful control of tube position and alignment.

Selected frames from the same equipment before and after renewal.






Thermo-Mechanic provides technical support for marine boiler tube renewal, tube-sheet work and the maintenance, repair and renewal of heat-transfer equipment.
Scope and duration are not quoted before the failure has been seen in place. Let us know the port where the vessel lies and the type of equipment, and contact us using the details below to arrange a survey.
0542 325 04 37